|
Showing: 1 to 10 of 776 matches for "a new launder"
|
Page
1
2
3
4
5
6
7
8
9 next
|
|
| TITLE |
A New Launder Design Procedure |
| SUMMARY |
... 9 1 Maintenance Department Visual Display Station (% if A New Launder Design Procedure . Equipment specifications . Maintenance requirements . ... |
| AUTHOR |
Green, H. R. ; Lamb, D. M. ; Taylor, A. D. |
| PUBLISHED |
1979 |
|
 |
|
| TITLE |
A New Launder Design Procedure |
| SUMMARY |
... ofSMAP. Division Smelter Maintenance Department and Plant A New Launder Design Procedure HR Green, DM Lamb. and AD Taylor Introduction ... |
| AUTHOR |
Green, H. R. ; Lamb, D. M. ; Taylor, A. D. |
| PUBLISHED |
1978 |
|
 |
|
| TITLE |
Instantaneous Access to Maintenance Data in a Copper Smelter |
| SUMMARY |
... To meet the requirements of the Clean Air Act of 1970 (as amended), new facilities for the control of smelter emissions were required and are now nearing the ... |
| AUTHOR |
Kinder, G. ; Davey, R. ; Gilges, R. ; Stoker, W. |
| PUBLISHED |
1979 |
|
 |
|
| TITLE |
Instantaneous Access to Maintenance Data in a Copper Smelter |
| SUMMARY |
... To meet the requirements of the Clean Air Act of 1970 (as amended), new facilities for the control of smelter emissions were required and are now nearing the ... |
| AUTHOR |
Kinder, G. ; Davey, R. ; Gilges, R. ; Stoker, W. |
| PUBLISHED |
1978 |
|
 |
|
| TITLE |
Instability in high velocity slurry flows |
| SUMMARY |
... Inc. New York and Basel. Landers. ... When While cascades are merely launder sections on steeper it comes to solids transport in free flowing gravity systems, the ... |
| AUTHOR |
Niepelt, W. A. ; Locher, F. A. |
| PUBLISHED |
1990 |
|
 |
|
|
|
|
|
|
|
|
|
| TITLE |
Kennecott Utah Copper Smelter Modernization |
| SUMMARY |
... The launder configuration was modified and new, ventilated launder covers were installed, to- gether with an improved launder burner system. ... |
| AUTHOR |
Newman, C. J. |
| PUBLISHED |
1999 |
|
 |
|
|
Showing: 1 to 10 of 776 matches for "a new launder"
|
Page
1
2
3
4
5
6
7
8
9 next
|
|